- The Modelux OO Gauge Dawlish Warren Footbridge.
- Construction Time : 180 Minutes
- Equipment and Materials Required : PVA Glue, tweezers
- Complexity of Instructions : Medium
- How Easy To Build : Medium
- Materials Constructed From : 1.3mm multicore
Extremely fine detail, but much easier to construct than you would imagine. Manufactured out of 1.3mm multicore board, which has been fully coloured. The kit when constructed is strong and highly realistic. It is designed to span 2 roads and can be sited at road or platform level.
OO Dawlish Warren Footbridge
SKU: MD-OO-BR-07
£16.00Price